Skip Navigation

Your feedback will help us improve this website.

Option 1 - Do minimum - health centre to remain

Option No. 1 retains the health centre. This option limits the opportunity for improvements to be made to the fire station access road, Albion bend and access to the library. The existing bridge structures over the railway on Maesteg Road would be stabilised or removed, or replaced with an underpass in order to maintain the Afan Valley cycle way link.

This option would not allow improvements to be made to the existing junctions at Station Road/Maesteg Road and Station Road/Margam Street, or to footways in the locality.

Plans

  • Option 1 - Straight alignment - Health Centre to remain (PDF 1.16 MB)

    m.Id: 31877
    m.ContentType.Alias: nptDocument
    mTitle: Option 1 - Straight alignment - Health Centre to remain
    mSize: 1.16 MB
    mType: pdf
    m.Url: /media/16900/c20910-ga-option-1.pdf